Email
What is the prepared base?:
If other, please specify:
Number of areas?:
Are the areas in the same location? Yes No
If no, please explain:
Are the areas to be surfaced at the same time? Yes No
If no, please explain:
Area square footage breakdown:
If additional areas, please describe
Please explain any access problems:
|
Address
Address 2
Country
Suggested use of black: up to 50% on playgrounds; 20% on walkways/decking; 0% in spray pools.
Graphics / Patterns
Explain
Construction Details:
Linear feet needed:
Special drain detail? Yes No (fax detail)
Wage details:
If wage scale, please describe County, State or Federal wages for cement mason, landscape contractors, skilled and unskilled labor:
Enter Material Tax %:
Schedule / Security details
Date of desired installation:
Date play equipment will be installed:
Who is in charge of SGS at night during construction and for 2-3 days during curing time for poured our tile products?:
Please enter additional comments
|